Audit generator banks and usable fuel

The original startup lessons ask whether a generator becomes available in time. This lesson asks a different question: can the available bank carry the backed load at all? Follow a source claim through its real-power conversion, post-loss capacity and fuel ledger. A failed arithmetic claim should stay failed even when the combined installed nameplates look impressive.

Run this lesson interactively

Learning objectives

Source statement

Define what is backed

The backed load may include IT, cooling needed for continuity, controls, fans, pumps, fuel transfer and permitted recharge. Essential demand is a declared classification, not another name for IT alone. The manuscript’s project claims that either generator bank supports the complete 27 MW facility. Each source unit is 3,000 kVA at a stated rated power factor of 0.8, or 2.4 MW under that rating relationship.

Editorial derivation

Reject the incorrect inequality

A ten-unit bank with one unavailable unit provides 9 × 2.4 = 21.6 MW, which is below 27 MW by 5.4 MW. Even ten healthy units provide only 24 MW. With no derating or loading ceiling, the elementary N+1 screen requires thirteen installed units per independent bank; twelve remain and provide 28.8 MW. With both factors at 0.9, fifteen installed units are required. Neither change constitutes an approved redesign.

Source statement

Follow fuel and time separately

At a constant 27,000 kW for 48 hours and an assumed source coefficient of 0.25 L/kWh, usable consumption is 324,000 L. Gross storage, reserve, inaccessible volume, quality, transfer pumps and replenishment are separate questions. A steady capacity total also does not establish startup, load-step acceptance, synchronizing, qualification or restoration. The transition storyboard is explanatory; it must not emit real closing commands or invented synchronization limits.

Predict → run → explain

  1. Read the declared boundary and units. Predict the selected result before calculating.
  2. Run the starting case and inspect the ledger, assumptions and model limits.
  3. Apply the challenge, run again, and explain the difference. Export only the last completed inputs and results.

Usable unit MW = unit MW × derating × loading; available MW = (installed − unavailable) × usable unit MW; elementary N+1 count = ceil(required MW / usable unit MW) + 1.

Declared starting inputs

{
  "requiredMW": 27,
  "unitMW": 2.4,
  "derating": 1,
  "loading": 1,
  "installed": 10,
  "unavailable": 1
}
Worked default — unrounded educational outputs
QuantityValueUnit
usableUnitMW2.4MW/unit
availableMW21.599999999999998MW
marginMW-5.400000000000002MW
minimumNPlusOne13units
statusscreen-failedscreen state

Challenge

Does thirteen installed per side close the capacity screen?

{
  "installed": 13
}

Twelve remain, giving 28.8 MW and 1.8 MW headroom. Dynamic, routing, fuel, emissions and equipment evidence remain open.

Worked challenge
QuantityValueUnit
usableUnitMW2.4MW/unit
availableMW28.799999999999997MW
marginMW1.7999999999999972MW
minimumNPlusOne13units
statusscreen-satisfiedscreen state

Separate usable-fuel ledger

Source statement: constant load and the stated source coefficient. Usable L = load kW × hours × L/kWh. Gross storage, reserve and transfer capability remain unresolved.

{
  "loadKW": 27000,
  "hours": 48,
  "litresPerKWh": 0.25
}
Source usable-fuel screen
QuantityValueUnit
usableLitres324000L

The generator bank that cannot meet its claim — static equivalent

  1. Expose ten labelled generator blocks per bank.
  2. Remove one and compare 21.6 MW with the 27 MW demand plane.
  3. Add units through the capacity-only control without erasing the open redesign badge.
  4. Trace bulk tank → transfer pump → day tank separately from the electrical route.

Per-bank surviving-unit table, capacity inequality and usable-fuel ledger.

Change installed units and derating; inspect a separate fuel calculation and an illustrative start/qualify/load sequence.

Narrative steps are not physical seconds. Essential states and quantities remain available without animation.

Assessment and answer criteria

4.1 · Find usable fuel for 8 MW over 36 h at 0.27 L/kWh.

Read answer and marking criterion

77,760 L before gross-volume and operational allowances.

Criterion: Convert MW to kW and preserve L/kWh.

Source: DCIE-R1 Appendix A, PDF pp.59-61

4.2 · Find the N+1 count for 27 MW with 2.4 MW units, derating 0.95 and loading 0.9.

Read answer and marking criterion

2.052 MW usable per unit; fourteen operating plus one spare = fifteen installed per bank.

Criterion: Round up the required operating count.

Source: DCIE-R1 Appendix A, PDF pp.59-61

4.3 · Why does a no-load engine run not prove a whole-facility transfer?

Read answer and marking criterion

It does not demonstrate load acceptance, transfer equipment, sustained fuel supply, cooling recovery or service continuity.

Criterion: List dependencies outside the engine-only test.

Source: DCIE-R1 Appendix A, PDF pp.59-61

Source and model boundaries

Data Centre Infrastructure Engineering, reference manuscript revision 1 (DCIE-R1), 11 October 2026, chapter 4, PDF pp.22–25. PDF page 1 includes the cover. manuscript-derived; not independent source verification.

Original educational adaptation. The private PDF and missing archive are not public downloads. Source statement, Editorial derivation, Illustrative assumption and Unresolved remain distinct.

Result schema: infrastructure-screen-1; content 2.0.0; model 1.0.0. Raw inputs, outputs, units, assumptions, source locators and canonical hashes. No supported in-browser Python verification protocol exists for this result family.