DATACENTER TWIN LAB

Lesson 12 / 12 · Facility energy planning

Separate PUE from continuity

How does assumed PUE change annual energy for the same 50 MW IT load?

By Mohammad Rezwan Khan · Engine 2.0.1 · Cite this lesson

Run this browser lesson →

Predict before you run

Write down your prediction, then change only the input below. In the interactive lesson, compare the starting case with the challenge and export a worksheet to retain your reasoning.

The two lesson configurations
InputStarting valueChallenge value
Assumed PUE1.25 ratio1.15 ratio

Reported quantity: kWh per 8,760 h. The live control accepts 1–2 ratio.

Reproduce the configuration

Constant 50,000 kW IT demand over 8,760 hours; assumed PUE of 1.25 or 1.15. This annual planning case has no outage timeline. PUE includes non-IT energy; do not add continuity losses again.

This lesson builds an annual planning case for the fixed IT demand and duration above; it does not use an outage preset. Open it above, run the starting case, switch to the challenge, and use “Verify against Python” to compare complete results. Use the worksheet export to keep the prediction, completed inputs and answer together.

Sources and verification

Original material by Mohammad Rezwan Khan, engine 2.0.1. Synthetic teaching cases; no facility calibration or independent external reproduction has been established. Annual PUE planning and outage continuity are different calculations. Full scope and evidence.